Connect All Equipment Routine should enable Switch Ports

A switch is not always equivalent to a “power switch”. A switch can be used for many different things… power just being one of them so there are a lot of use cases for setting state at sequence start.

That said, we realize that “power switches” are a very common type of switch and the beta has added a bunch of new options for using them in this manner. Specifically:

  • Coordinate a delay between switch state application and equipment connect
  • Coordinate the order that switch state is to be applied
  • Coordinate delays between individual switches in a switch state

Additional details here:

SGPro 4.4.1 Update - Switch Delays and Bugs - Sequence Generator - Main Sequence Software (sequencegeneratorpro.com)