Sorry, I’m not sure what this means. What is a switch port? If you are referring to switch state values, SGPro should never complain if a switch is already in the state it’s supposed to be in.
Oh. Ok, I had somehow misinterpreted this (original) report. Too many moving parts I guess. Thx for the details here. I’ll take a look…
It depends for how long SGPro has been open. Currently there is no dynamic refresh for this field, but I can add it. In other words, If SGPro was opened before 9pm, then it is correct that it reads “today”. But in reality, it is only important that the internals of SGPro understand it to be “today”. From user’s perspective, I think it safe to always show the “next” end time as long as it isn’t propagated to the sequencing engine (which would cause your sequence to continually end)
Thx, will investigate
Yep, thanks. Lot’s of spots like this need to be converted to use the new open the Control Panel method… still using the old method that pre-dated the tabs on the left side.